Skip To Main Content

Logo Image

North Kitsap School District

Logo Title

2018 Facilities and Technology Capital Levy

The North Kitsap School District's 2018 Facilities and Technology Capital Projects Levy was introduced to address critical infrastructure needs and support a safe and effective learning environment. This levy aimed to generate an average of $10 million per year over four years, with an estimated rate of $1.26 per $1,000 of assessed value. The funds were designated for major upgrades and repairs to aging HVAC systems, roofs, security and fire alarm systems, technology infrastructure, turf fields, parking lots, and the pool. By replacing the expiring bond from 2018, this levy ensured that necessary improvements could be made without diverting resources from essential classroom activities and student programs.

Key Areas of Improvement

The 2018 Facilities and Technology Capital Projects Levy focuses on several key areas to enhance our school facilities' safety, functionality, and overall quality. These projects ensure that our learning environments are well-maintained, technologically equipped, and accessible to all students and staff. Below are the main improvement categories and specific projects under each category.

Critical Repairs and Safety Upgrades

  • HVAC Replacement: Replacing outdated HVAC units to improve air quality, reduce energy consumption, and ensure consistent climate control.
  • ADA Ramp: Installing ADA-compliant ramps to enhance accessibility for students and staff with disabilities.
  • Auxiliary Gym Roof Replacement: Replacing the roof of the auxiliary gym to address maintenance needs and ensure safety.
  • Baseball Fields Drainage and Irrigation Improvements: Enhancing drainage and replacing irrigation systems on baseball fields to prevent water accumulation and maintain field conditions.

Security Upgrades

  • Installation and Upgrades of CCTV Cameras: Installing and upgrading CCTV cameras to improve surveillance and enhance security across school campuses.
  • Upgrades to Access Control System: Upgrading to keyless entry technology to control building access more effectively and increase overall safety.
  • Additional CCTV Cameras & Access Control System at Odin Inn: Adding more CCTV cameras and upgrading access control systems to improve security at Odin Inn.
  • Security Intrusion Alarm System: Installing a new security alarm system to detect and deter unauthorized access.

Technology Replacement and Upgrades

  • New Computers/Laptops/iPads: Providing new technology devices to students and educators to support digital learning and ensure access to modern educational tools.
  • School Wiring Upgrades: Upgrading wiring systems to support modern technology needs, improve connectivity, and ensure safe electrical infrastructure.
  • Technology Installation and Upgrades - Building 3: Upgrading and installing new technology systems in Building 3 to enhance educational resources.
  • Distributed Antenna System: Installing a system to improve communication and connectivity within school buildings.

Facility Enhancements

  • Exterior Painting/Sealing: Applying fresh paint and sealing to the exterior of school buildings to protect against weather damage and improve appearance.
  • Portable Demolition: Removing outdated portable classrooms to make way for new structures or revitalized outdoor spaces.
  • Roof Repair/Re-Coating: Conducting essential roof repairs and recoating to prevent leaks and structural damage, ensuring building longevity.
  • Track Repairs and Resurfacing: Refurbishing the school track to ensure a safe and high-quality surface for athletic events and physical education.

These projects funded by the levy are essential for maintaining a safe, secure, and effective learning environment for all students and staff in the North Kitsap School District.

 

Project Details by School

Cost Information

The 2018 Facilities and Technology Capital Projects Levy maintains a flat tax rate of $1.26 per $1,000 of assessed property value. Over the course of four years, this levy is projected to collect a total of $39,962,013, funding crucial upgrades and repairs to ensure safe, functional, and technologically equipped schools.

Collection Year
Estimated Levy Rate/$1000
Assessed Value Levy Amount
2019 $1.26 $9,271,660
2020 $1.26 $9,735,243
2021 $1.26 $10,222,005
2022 $1.26 $10,733,105